Projects · Track record
45 contracts across DR Congo and Rwanda.
The full list from the company profile: Bailey bridges on national roads, schools, markets, police facilities, street paving and plant hire. Contract references are shown where the profile gives them.
Footprint
Site map
Select a site to list its contracts.
- Project site (size shows the number of contracts)
- Project shown in photos only
- Haulage routes
Green dots are sized by the number of contracts. The framed detail shows the Kivu and western Rwanda.
Goma
North Kivu, DR Congo. 4 contracts
- Office building in GomaUNDP / PNUD, Buildings
- Holy Emmanuel church and hand-wash stationHoly Emmanuel, Buildings
- Public warehouse for Ets UmojaEts Umoja, Buildings
- Stone-paved roadFonds Social de la RDC, Paving
Mugunga
North Kivu, DR Congo. 3 contracts
- Site works, playground and sports ground, Congolese National Police training campUNOPS, 2011, Buildings
- Administration building, kitchen, refectory, infirmary, generator house, septic tanks and gatehouse, police training campUNOPS, 2011, Buildings
- Training hall, two sanitary blocks and three septic tanks, police training campUNOPS, 2011, Buildings
Sake–Masisi
North Kivu, DR Congo. 5 contracts
- Civil engineering plant hire for the Sake–Masisi road rehabilitationUNOPS, 2009, Plant & truck hire
- Civil engineering plant hire for the Sake–Masisi road rehabilitation2010, Plant & truck hire
- Dump truck hire for the Sake–Masisi road rehabilitationUNOPS, 2010, Plant & truck hire
- Dump truck hire for the Sake–Masisi road rehabilitationUNOPS, 2009, Plant & truck hire
- Plant hire for mechanised works on the Sake–Masisi roadUNOPS, 2009, Plant & truck hire
Masisi–Nyabiondo
North Kivu, DR Congo. 4 contracts
- Masonry culvert headwalls on the Masisi–Nyabiondo roadUNOPS, 2011, Drainage & sanitation
- Masonry culvert headwalls on the Masisi–Nyabiondo roadUNOPS, 2011, Drainage & sanitation
- Semi-mechanised installation of metal culverts on the Masisi–Nyabiondo roadUNOPS, 2011, Drainage & sanitation
- Semi-mechanised installation of metal culverts on the Masisi–Nyabiondo roadUNOPS, 2011, Drainage & sanitation
Masisi–Kibua
North Kivu, DR Congo. 2 contracts
- Rehabilitation of 48 km Masisi–Kashebere and reopening of 33 km Kashebere–Kibua, lots 1 and 3UNOPS, 2012, Roads & earthworks
- Abutments for the Loashi (PK 7+600) and Tonghi (PK 76+150) bridges, Masisi–Kibua roadUNOPS, Bridges & structures
RN2, Rutshuru
North Kivu, DR Congo. 2 contracts
- Rehabilitation of the Mabenga Bailey bridge, RN2 Goma–Butembo, PK 92+000Office des Routes, Bridges & structures
- Rehabilitation of the Rwindi Bailey bridge, RN2 Goma–Butembo, PK 147+000Office des Routes, Bridges & structures
Lubero
North Kivu, DR Congo. 1 contract
- Rehabilitation of Vweteta primary schoolUNOPS, 2010, Buildings
Beni
North Kivu, DR Congo. 2 contracts
- Rehabilitation of the Beni–Mangina road, RN44, PK 0+000 to PK 30+150Office des Routes, 2009, Roads & earthworks
- Rehabilitation of the Semuliki Bailey bridge, RN4 Beni–Kasindi, PK 18+000Office des Routes, Bridges & structures
Biruwe
North Kivu, DR Congo. 1 contract
- Ten-office administration building and generator house on the Walikale–Kisangani roadUNOPS, Buildings
Uvira
South Kivu, DR Congo. 1 contract
- Rehabilitation of Amani primary schoolUNOPS, 2010, Buildings
Idjwi
South Kivu, DR Congo. Project shown in the profile photos.
- Rehabilitation of Lwamarhulo primary schoolIdjwi, South Kivu
Bumba–Lisala
Mongala, DR Congo. 2 contracts
- Rehabilitation of the Yamaluka–Yandongi–Mbuku and Yandongi–Pont Mongala roads (94 km)UNOPS, Roads & earthworks
- Mechanised road rehabilitation in the Lisala and Bumba territoriesUNOPS, 2013, Roads & earthworks
Gemena–Budjala
Sud-Ubangi, DR Congo. 1 contract
- Mechanised road rehabilitation in the Gemena and Budjala territoriesUNOPS, 2013, Roads & earthworks
Mogalo
Sud-Ubangi, DR Congo. 2 contracts
- Mogalo marketUNOPS, 2012, Buildings
- Structures and drainage on the Bozene–Mogalo roadUNOPS, 2012, Drainage & sanitation
Kigali
Kigali, Rwanda. 2 contracts
- Roads and access tracks for the Hill View Estates developmentDN International, 2009, Roads & earthworks
- Road network and villasDN International, Roads & earthworks
Rubavu
Western Province, Rwanda. 3 contracts
- Umuganda stadium pitch rehabilitation and drainage for synthetic turfINADES, Drainage & sanitation
- Heavy goods vehicle park and hangarBuildings
- Masonry drainage ditchesCDF, Drainage & sanitation
Karongi (Kibuye)
Western Province, Rwanda. 1 contract
- Lakeside chalets on Lake KivuBuildings
Register
All contracts
45 contracts shown
| No. | Project | Client | Place | Year | Reference |
|---|---|---|---|---|---|
| 01 | Roads and access tracks for the Hill View Estates development Roads & earthworks, completed | DN International | Masaka, Kigali | 2009 | Certificates of completion and excellence |
| 02 | Office, warehouse, garage and parking for Betrec Buildings, completed | Betreconst | Location to confirm | — | Certificate of completion |
| 03 | Rehabilitation of the Beni–Mangina road, RN44, PK 0+000 to PK 30+150 Roads & earthworks | Office des Routes | Beni, North Kivu | 2009 | OR/DP/NK/PM/10/200 |
| 04 | Rehabilitation of the Mabenga Bailey bridge, RN2 Goma–Butembo, PK 92+000 Bridges & structures, completed | Office des Routes | Rutshuru, North Kivu | — | OR/DP/NK/PM/06/20 |
| 05 | Rehabilitation of the Rwindi Bailey bridge, RN2 Goma–Butembo, PK 147+000 Bridges & structures, completed | Office des Routes | Rutshuru, North Kivu | — | OR/DP/NK/PM/09/20 |
| 06 | Rehabilitation of the Semuliki Bailey bridge, RN4 Beni–Kasindi, PK 18+000 Bridges & structures, completed | Office des Routes | Beni, North Kivu | — | OR/DP/NK/PM/03/200 |
| 07 | Site works, playground and sports ground, Congolese National Police training camp Buildings | UNOPS | Mugunga, Goma | 2011 | 2011/028/010/73058/M |
| 08 | Administration building, kitchen, refectory, infirmary, generator house, septic tanks and gatehouse, police training camp Buildings | UNOPS | Mugunga, Goma | 2011 | 2011/032/012/73058/M |
| 09 | Training hall, two sanitary blocks and three septic tanks, police training camp Buildings | UNOPS | Mugunga, Goma | 2011 | 2011/030/011/73058/ME |
| 10 | Civil engineering plant hire for the Sake–Masisi road rehabilitation Plant & truck hire, completed | UNOPS | Masisi, North Kivu | 2009 | 2009/0172/001/59419/LD |
| 11 | Civil engineering plant hire for the Sake–Masisi road rehabilitation Plant & truck hire, completed | — | Masisi, North Kivu | 2010 | 2010/0331/005/70575/LD |
| 12 | Dump truck hire for the Sake–Masisi road rehabilitation Plant & truck hire, completed | UNOPS | Masisi, North Kivu | 2010 | 2010/0309/004/70575/LD |
| 13 | Masonry culvert headwalls on the Masisi–Nyabiondo road Drainage & sanitation | UNOPS | Masisi, North Kivu | 2011 | 2011/011/007/70575/ME |
| 14 | Masonry culvert headwalls on the Masisi–Nyabiondo road Drainage & sanitation | UNOPS | Masisi, North Kivu | 2011 | 2011/020/008/70575/ME |
| 15 | Semi-mechanised installation of metal culverts on the Masisi–Nyabiondo road Drainage & sanitation | UNOPS | Masisi, North Kivu | 2011 | 2011/022/009/70575/ME |
| 16 | Semi-mechanised installation of metal culverts on the Masisi–Nyabiondo road Drainage & sanitation | UNOPS | Masisi, North Kivu | 2011 | 2011/003/006/70575/ME |
| 17 | Rehabilitation of Vweteta primary school Buildings | UNOPS | Lubero, North Kivu | 2010 | CDOC/10/71043/PARSE/1/035/002/PJ |
| 18 | Rehabilitation of Amani primary school Buildings | UNOPS | Uvira, South Kivu | 2010 | CDOC/10/71043/PARSE/1/030/001/PJ |
| 19 | Dump truck hire for the Sake–Masisi road rehabilitation Plant & truck hire, completed | UNOPS | Masisi, North Kivu | 2009 | 2009/0238/002/59419/LD |
| 20 | Plant hire for mechanised works on the Sake–Masisi road Plant & truck hire, completed | UNOPS | Masisi, North Kivu | 2009 | 2009/0251/003/CDOC/59419/LD |
| 21 | Road network and villas Roads & earthworks, completed | DN International | Masaka, Kigali | — | Certificate of excellence |
| 22 | Rubble masonry and gabion retaining wall Bridges & structures, completed | UNOPS | Location to confirm | — | — |
| 23 | Office, warehouse and parking for La Colombière Buildings, completed | La Colombière | Location to confirm | — | Works agreement 002 |
| 24 | Private house Buildings, completed | Private client | Location to confirm | — | Works agreement 001 |
| 25 | Fuel station Buildings, completed | Private client | Location to confirm | — | Works agreement 002 |
| 26 | Umuganda stadium pitch rehabilitation and drainage for synthetic turf Drainage & sanitation, completed | INADES | Rubavu, Rwanda | — | — |
| 27 | Steyr Rwanda garage Buildings, completed | Steyr | Rwanda | — | — |
| 28 | Lakeside chalets on Lake Kivu Buildings, completed | — | Kibuye, Rwanda | — | — |
| 29 | Heavy goods vehicle park and hangar Buildings, completed | — | Rubavu, Rwanda | — | — |
| 30 | Two private villas Buildings, completed | Private client | Location to confirm | — | — |
| 31 | Office building in Goma Buildings, completed | UNDP / PNUD | Goma, North Kivu | — | — |
| 32 | Masonry drainage ditches Drainage & sanitation, completed | CDF | Rubavu, Rwanda | — | — |
| 33 | Ten-office administration building and generator house on the Walikale–Kisangani road Buildings, completed | UNOPS | Biruwe, North Kivu | — | — |
| 34 | Rehabilitation of the Yamaluka–Yandongi–Mbuku and Yandongi–Pont Mongala roads (94 km) Roads & earthworks, completed | UNOPS | Bumba, Mongala | — | C-001-79808-FULLCOM-ZZI MWE-CTC-1201 |
| 35 | Mogalo market Buildings | UNOPS | Kungu, Sud-Ubangi | 2012 | CDOC/12/77040/PARRSA/T/035/001/BT |
| 36 | Structures and drainage on the Bozene–Mogalo road Drainage & sanitation | UNOPS | Sud-Ubangi | 2012 | CDOC/12/77040/PARRSA/ZZI MWE-CTC-1201 |
| 37 | Rehabilitation of 48 km Masisi–Kashebere and reopening of 33 km Kashebere–Kibua, lots 1 and 3 Roads & earthworks | UNOPS | Masisi, North Kivu | 2012 | 2012/040/015/82990/ME |
| 38 | Transport of PP pipes from Kampala to Goma, Uvira and Kalemie Transport | OXFAM | Uganda to DR Congo | 2013 | 2013/011/016/77019/SM |
| 39 | Mechanised road rehabilitation in the Lisala and Bumba territories Roads & earthworks | UNOPS | Mongala | 2013 | CDOC/13/77040/PARRSA/T/260/003/BT |
| 40 | Mechanised road rehabilitation in the Gemena and Budjala territories Roads & earthworks | UNOPS | Sud-Ubangi | 2013 | CDOC/13/77040/PARRSA/T/261/004/BT |
| 41 | Abutments for the Loashi (PK 7+600) and Tonghi (PK 76+150) bridges, Masisi–Kibua road Bridges & structures | UNOPS | Masisi, North Kivu | — | — |
| 42 | Holy Emmanuel church and hand-wash station Buildings | Holy Emmanuel | Goma, North Kivu | — | — |
| 43 | Public warehouse for Ets Umoja Buildings | Ets Umoja | Goma, North Kivu | — | 0016/0125/GOM/UM |
| 44 | Stone-paved road Paving | Fonds Social de la RDC | North Kivu | — | C 001/21/FS/RDC/NK |
| 45 | Stone-paved car park Paving | Sion Hotel | Location to confirm | — | LPO No 05/SH/GS |
Photography
On site
Photos from the company profile.













Work with us
Tell us what you need to build, move or buy.
Our teams in Goma and Kigali answer directly, by phone, WhatsApp or email.